American Rare Earths: 18 holes at Cowboy State Mine show rare earths from surface to 200 m
Assays from 18 drill holes at Halleck Creek, Wyoming, average 3,327 ppm TREO, but the reported lengths are along the hole and true widths are not yet known.

American Rare Earths has reported results for 18 drill holes from its feasibility campaign at the Cowboy State Mine area, part of the Halleck Creek project at Red Mountain, Wyoming, according to redimin.cl. redimin.cl
redimin.clredimin.clOpen source ↗ The program found rare earth mineralization from surface to a depth of about 200 metres. The reported lengths are drilled lengths, and the true widths of the mineralized bodies are not yet known.
Assay results and best intervals
Certified assays by ALS Global cover 2,879.6 metres drilled. The company analysed 1,318 geological intervals, covering 2,788.4 metres of sampled core; the statistics exclude quality-control samples. The simple average was 3,327 ppm total rare earth oxides (TREO) and the median was 3,971 ppm. A total of 1,108 samples, or 84%, exceeded the 1,000 ppm cutoff used for the current Cowboy State Mine resource.
Hole HC26-RM060 returned 199.95 metres at 4,242 ppm TREO from surface to the end of the hole. HC26-RM058 returned 199.91 metres at 4,159 ppm, and HC26-RM059 returned 199.50 metres at 4,149 ppm, both from surface. Other intervals include 168.31 metres at 4,311 ppm in HC26-RM063 from 31.60 metres, and 46.50 metres at 5,291 ppm in HC26-RM067 from 46.54 metres. The highest single value was 13,871 ppm TREO over 0.80 metres, between 124.07 and 124.87 metres, in HC26-RM065.
Method, composition and limits
Significant intervals were calculated with a 1,000 ppm cutoff, up to two metres of internal dilution and a minimum length of three metres. The same cutoff underlies the current Cowboy State Mine resource published in November 2025, which estimated about 547.5 million tonnes. redimin.cl
redimin.clredimin.clOpen source ↗
The latest batch included 12 holes, HC26-RM057 to HC26-RM068, and 932 sample intervals, averaging 3,257 ppm TREO, with 80% of samples above the cutoff. The six holes reported earlier averaged 3,497 ppm TREO. Across the full set, magnetic rare earth oxides (MREO) averaged 925 ppm, or 27.8% of TREO, and neodymium and praseodymium oxides made up 22.7%. Mean thorium oxide and uranium oxide grades were 60 and 9 ppm. Core recovery averaged 96.2% over 1,226 runs and was lower in the weathered zone near surface.
Holes HC26-RM066 to HC26-RM068 had lower average grades, 1,168 to 2,246 ppm TREO. The company attributes this to longer intervals of intrusive units other than the host rock of the main mineralization. It says the drilling database will support an update of the resource estimate for the feasibility study. Collar coordinates are provisional pending the final survey.