Power › Cars2 min read

BYD launches experimental solar and storage FLASH Charging site with robotic connection in Abu Dhabi

The pilot installation combines solar panels, batteries and a charging robot; per BYD, FLASH Charging takes a battery from 10% to 70% in five minutes.

BYD launches experimental solar and storage FLASH Charging site with robotic connection in Abu Dhabi
Photo: CEphoto, Uwe Aranas, Wikimedia Commons, CC BY-SA 3.0 · License: CC BY-SA 3.0

Chinese automaker BYD has started up an experimental installation in the Abu Dhabi desert, United Arab Emirates, that for the first time combines its solar generation, energy storage, ultra-fast charging and robotic connection, invdes.com.mx reports invdes.com.mxinvdes.com.mxinvdes.com.mxOpen source ↗. BYD executive vice president Stella Li described it as the first world presentation of a solution that unites solar generation, storage and FLASH Charging.

Solar, storage and FLASH Charging

The site uses the SSC (Solar, Storage and Charging) system. Solar panels produce electricity, and batteries hold it until a vehicle needs to charge. According to BYD, this architecture lets the system operate independently of the power grid, which matters for remote regions or places with limited energy infrastructure.

According to data released by the company, FLASH Charging restores a battery from 10% to 70% in five minutes, and reaching 97% takes about nine minutes. The desert location offers high temperatures, intense solar radiation and little rainfall, conditions suited to testing an installation of this kind.

The solar systems come from BYD Solar, the company's photovoltaic division. It has more than 16 years of activity, a presence in more than 100 countries and regions, a research team of more than 300 specialists and more than 200 patents invdes.com.mxinvdes.com.mxinvdes.com.mxOpen source ↗. The project follows the Three Green Dreams that BYD chairman Wang Chuanfu presented in 2006: generating electricity from the sun, storing it in batteries and using it to power electric vehicles.

Robotic connection and expansion plans

The installation has a robotic arm that identifies the charging port, opens its cover and inserts the connector without human intervention. It relies on cameras, visual recognition and force sensors. The Automated Valet Parking function drives the car to a pre-assigned charging space. The driver only leaves the vehicle and locks it, after which the arm connects it to FLASH Charging.

BYD announced that it plans to install 6,000 FLASH Charging stations in international markets before the end of 2027. The company also continues to develop energy storage, including the second generation of the Blade Battery.

In the information released, BYD did not state installation costs for the integrated solution invdes.com.mxinvdes.com.mxinvdes.com.mxOpen source ↗. Large-scale deployment will depend on investment costs, equipment availability and vehicle compatibility with the new technologies.

Sources · 1

Found a mistake?
  1. ↩

Read also

Up next

The next story opens automatically

More
Follow us

Type at least two letters — results appear instantly

↑↓to choose↵to openescto close